交大土木
標點 Introduction
分隔線
標點 Degree Program
分隔線
標點 Financial Assistance
分隔線
標點 International Students
分隔線
標點 International Program
分隔線
標點 Position Vacancy
分隔線
標點 Photos(in Chinses)
分隔線
標點 Laboratories
分隔線
標點 ATU Plan
分隔線
標點 Schoolfellow
分隔線
標點 Home
分隔線
/ Research Areas & Project / Department members / Structural Building / Facilities / Admission / International Program /
裝飾符號 Structure Building

Introduction

Civil Engineering department is located at Engineering Building II  
Structural Testing Laboratory

The Department and Institute's facilities are as following: The Structural and Material Laboratory, Soil Mechanics Laboratory, Dynamic Soil Testing Laboratory, Rock Mechanics Laboratory, Retaining Wall Modeling System, Concrete Chemical Analysis Laboratory, Concrete Structures and Components Durability Laboratory, Concrete Mechanics Laboratory, Fireproof Material Laboratory, Fluid Machanics Laboratory, Ocean and Hydraulic Engineering Laboratory, Sediment Transport Laboratory, River Engineering Laboratory, Surveying Laboratory, Construction Automation Laboratory, Computer Room and Departmental Library.To meet the research needs, the Building of Civil and Structural Engineering Laboratories was established in 1996. The five story reinforced concrete structure has a full one-level basement. The bearing walls of the strong floor, hydraulic pumps associated with testing machines and other electro-mechanical facilities are stored in the basement. The ground floor houses a large scale Structural Testing Laboratory, a Foundation Modeling Laboratory and Meterial Testing Laboratories. The large scale Structural Testing Laboratory is located in a five story high bay area 20m long and 15m wide, equipped with a 1m thick strong floor and a 13m wide, 12.5m high reaction wall. This experimental facility is capable of handling large scale structural model testing. The strong floor and the reaction wall are equipped with 50 ton capacity threaded bores to fasten testing equipment and specimens. A crane capable of handling 20 ton load is available in the large scale Structural Testing Laboratory. Various types of other research and teaching laboratories are located in the rest of the building from the second to the fifth floor. These include Geotechnical Engineering and Fluid Mechanics Loboratories.

Laboratories

Fifth Floor
Laboratory for Research on Earthquake Engineering
Fourth Floor
Composites Concrete Laboratory
Structure Automatic Monitoring Laboratory
Third Floor
Environmental Laboratory
Elevated Land Mechanics Laboratory
Geological Measurement Laboratory
First Floor
Civil Materials Laboratory
MTS Triaxial Rock Laboratory
Basement
HPC Laboratory

Laboratory photo

Height13m、Width12m、Thickness1m reaction force wall

13-meter tall, 12-meter wide, 1-meter thick Reaction Wall

100噸動態試驗機

100-ton Hydraulic Actuator

木工車床工作台等設備

Woodworking Machinery

模擬橋柱實驗

Bridge Column Tests

模具、鐵材放置場(地下室) 

Storage Space (Basement)

高7公尺、寬5公尺之反力架

7-meter tall, 5-meter wide Reaction Frame

動態試驗機之控制室

Control Room

 工具齊全之工作間 

Workshop

車、銑床等設備(地下室)

Metalwork Machinery (Basement)

 

 

 

 


top
Last Updated: Mon, 2013-08-19 10:51 AM
Webmaster: contact@www.cv.nctu.edu.tw
2008c Department of Civil Engineering in National Chiao Tung University